Almost 3 years ago, over a dozen dudes well versed in concrete work* got together to pour the floor for the warehouse out at the quarry. It was quite an event (covered here) with much fanfare. Well, last week, a considerably fewer number of fellas with considerably less concrete pouring knowledge poured the floor for the quarry warehouse expansion. The experience was both nostalgia and back-breaking*.
The expansion of the warehouse has been long in the works and when completed, it will include more dwelling units, a proper kitchen, showers, and FLUSH TOILETS! After much preparation of plumbing, insulation, radiant heating tubes, forms, and more, 20 yards of concrete arrived. The 5 or so of us did the best we could, and it turned out pretty nice. There was a blowout or two of forms and everything set up quicker than we wished leading to not the smoothest finish, but throw a rug on it and we're good to go.
In reading back over the last post, I laughed at the ever so naive last line: "Hopefully I'll have a post about putting up the warehouse in just a couple weeks!" Three months later was a post about putting up some of the first beams and 8 months later was a post about insulating the place. This time around, I understand that anything that resembles a building is still a long way off. But that doesn't mean it will be any less cool when it is complete! Yeehaw for progress!
|